Accounts Payable Audit: Search for Unrecorded Liabilities
How to audit accounts payable: why completeness is the main risk, the key procedures, and how to run the search for unrecorded liabilities step by step.
Read more →A test of controls gives you evidence that a control operated effectively throughout the period you want to rely on it. If it did, you can reduce the substantive work on the balances that control protects. If it did not, you are back to substantive testing, usually more of it.
This guide covers when you have to test controls, how to design the test, how many items to pick, and what to do when you find a deviation.
The wording differs, but the logic is the same in all of them.
You test operating effectiveness when either of these is true:
If neither applies, you can take a fully substantive approach. You still have to understand the controls relevant to the audit and check they have been implemented (AU-C 315), but you do not test whether they operated all year.
These three get mixed up often.
| Question | How you answer it | Is it a test of controls? |
|---|---|---|
| Is the control designed to prevent or detect the misstatement? | Inquiry and judgment about the control as described | No |
| Was it implemented, does it exist and is it in use? | A walkthrough of one transaction, observation | No |
| Did it operate effectively all period? | Inspection, reperformance and observation over a sample | Yes |
A walkthrough shows the control is in place on the day you look. It does not tell you it worked in March, July and November.
Most tests combine inquiry with inspection or reperformance.
Write the control so it can be tested: who does what, how often, using what, to prevent or detect which misstatement.
Then list the attributes: the specific things that must be true for one instance of the control to count as performed correctly. Each attribute is tested for every sample item.
Example control: "The AP clerk matches each vendor invoice to an approved purchase order and a receiving report before the invoice is entered for payment. Differences over $500 go to the controller for approval."
Attributes:
Sample size depends on how often the control runs, how much you rely on it, and how many deviations you expect.
Many firms use a frequency table like this for manual controls you plan to rely on:
| How often the control runs | Typical sample size |
|---|---|
| Annually | 1 |
| Quarterly | 2 |
| Monthly | 2 to 5 |
| Weekly | 5 to 15 |
| Daily | 20 to 40 |
| Many times a day | 25 to 60 |
Use the higher end when you rely on the control heavily or when it addresses a significant risk.
For statistical sampling, the AICPA Audit Sampling guide gives sizes based on confidence, tolerable deviation rate and expected deviation rate. Two common ones: with zero expected deviations and a 5% tolerable rate, the sample is 59 items at 95% confidence and 45 items at 90% confidence.
Automated controls are different. An application control works the same way every time unless someone changes it. You can usually test one instance, provided the IT general controls over change management and access are effective.
Select items from the whole period you rely on, not just the months you were on site. If you test at an interim date, you need evidence for the remaining period too: a roll-forward of inquiries and a few more items, or reliance on how stable the process was.
Use one row per sample item and one column per attribute. Record the document you inspected and where it is, not just a tickmark. A reviewer should be able to pick any row and see what you saw.
A deviation is any sample item where an attribute was not met. When you find one:
Under AU-C 330 and ISA 330, if a control has not changed since you last tested it, you may rely on prior-year evidence. You must still confirm it has not changed, and you must retest it at least once every third year. This does not apply to controls over significant risks: those are tested every year.
When controls test clean, you can often reduce the size of your substantive tests, but never to zero for material balances. When they fail, the substantive work grows. Either way, the working papers need to show the link between the controls conclusion and the substantive plan.
Warp runs controls testing on the samples you give it: each attribute is checked against the evidence, and every result links to the page it came from, so your reviewer checks the conclusion instead of re-doing the inspection. See controls testing in Warp.
Want to talk about this?
How to audit accounts payable: why completeness is the main risk, the key procedures, and how to run the search for unrecorded liabilities step by step.
Read more →The three stages of analytical procedures in an audit, what AU-C 520 and ISA 520 require, and how to build an expectation precise enough to count as evidence.
Read more →The financial statement assertions under AU-C 315, ISA 315 and PCAOB AS 1105, what each one means, and the audit procedures that test it.
Read more →